Updates this winter were the following. Flush mount electronics, change thru hull fittings, relocated batterys from the stern courners to the area behind the rear fuel tank, installed new wash down hose from thru hull to pump, removed the old gauges and installed the ICommand System, and gave her a good cleaning. Painted the bottom today and it will go in the water this Tuesday. All thats left is to install the prop.
Next winters list is to replace both fuel tanks and hoses, and replace the switch panel on the dash.
Next winters list is to replace both fuel tanks and hoses, and replace the switch panel on the dash.



