- Joined
- Jul 27, 2025
- Messages
- 22
- Reaction score
- 1
- Points
- 3
- Age
- 66
- Model
- Express 330
Approx 1100 hours … new water
Pump impellers, lower unit oil, crankcase oil, filters, fuel filters, zincs, new VST’s, fuel pumps, gaskets, engine mounted tilt switches. No exhaust issues.
Work should be finished in approx 2-3 weeks I’m hoping. Upgrading to 300’s on a 330 express. Boat is in Reedville. When finished I will be available to sea trial if interested. Is there any k retest in these motors by anyone here. I haven’t set a price yet but wanted to check interest before I make them available
Pump impellers, lower unit oil, crankcase oil, filters, fuel filters, zincs, new VST’s, fuel pumps, gaskets, engine mounted tilt switches. No exhaust issues.
Work should be finished in approx 2-3 weeks I’m hoping. Upgrading to 300’s on a 330 express. Boat is in Reedville. When finished I will be available to sea trial if interested. Is there any k retest in these motors by anyone here. I haven’t set a price yet but wanted to check interest before I make them available