Should there be any concerns over operating an onboard AC charger(Guest 2 stage, 3 bank 30amp) while the engines(200HP OX66) are running and also charging the batteries? The onboard charger floats at 13.6V. Goal would be to quickly bring the deep cycle house battery up after using downriggers, etc.
Current normal configuration is S/B engine charges its start battery + the house battery and the port engine charges its start battery. Really don't want to change the physical wiring set-up.
Current normal configuration is S/B engine charges its start battery + the house battery and the port engine charges its start battery. Really don't want to change the physical wiring set-up.