A
NA2P said:Yes John. I am going to run that system. I had seen it in the Boaters World catalog with that schematic you had sent with your extras on it. Thats a good price for anyone to purchase it. My friend orders my stuff at his repair shop for me so everything is about 50 percent or better than list. Its going to cost me 210 . But thanks for the tip !
Pete
NA2P said:Started to drill and mount the new rear bulkhead area electronics. I still have more work to do. The the bulk..harder things..well nothing is ever that hard.. is pretty much done. I do need to mount the BEP Maxi fuse holder that will carry a 40 amp fuse on the feed from the house switch to the added fuse panel in the rear. I have 35 ft of 4ga red and black Ancor which I will start laying out and crimping on the lugs tomorrow. Here are some pics of the progress so far..not bad for a 1/2 days work.
Battery switch with fuse panel and buss bars.
![]()
Added rigging tube to run start battery cables over bilge area. Notice the 2 new Racor fuel filters with the Floscan sensors installed.
![]()
New 3-way for livewell/washdown...yeah yeah I know everyone wants it kept seperate. I could care less if I have baitfish in the well I will reach over with a pail for water. Maybe at a later date I will add a 2nd pump. Notice the new lever direction plate.Yeah I am sick.
![]()
2 battery trays on the port rear for the start batteries.
![]()
Battery tray for house battery on the starboard side rear.
![]()
Wide shot of transom/rear bulkhead. Looking good to me.
![]()
A ProMariner 300 charger that will be mounted above the rig tube in the center. This will be the last thing mounted and wired into the BEP battery switch.
![]()